Solar power plant in Törökszentmiklós 2
General information
- Status: In operation
- Developed, constructed and operated by VPP Solar Kft.
- Project type: Free market
- Network operator: Opus Titász Zrt.
- Project year: 2023
Installed capacity and technical data
- Number of projects: 1
- Installed AC capacity: 4,980 kW
- Installed DC capacity: 6,739 kW
- Type of solar panels: Astronergy CHSM72M 540W
- Number of solar panels: 12,480
- Mounting structure: Tracker